Total Pageviews

05 January 2013

A small change in plans


Please allow me the pleasure of wishing everybody a happy new year and a great 2013.
Plans have changed a little since christmas and the mezzanine level idea has been thrown out the door, so to speak.
After talking to the builder the mezzanine level has been scrapped due to something that was going to be bigger than Ben Hur.
I did not want trusses in the area of the model railway so that totally altered the structural integrity of the garage and it would have to be structurally redesigned by an engineer etc. etc.etc.
I think you get the idea, heaps of money thrown at something will resolve any issue but I don't have heaps of money so that's it.
Plan B has now been activated and my railway "room" will now be a 6m x 5m area at the end of the garage.
The garage will be the longest I can fit on the site being 14m long with a wall and door way positioned 9m from the entrance allowing me a room of 5m at the rear for the layout.
This room will be fully lined which should help greatly in controlling the dust which really is a pain in the current garage I am using for MRWAIN.
I have fired up 3rd Planit and am currently learning the ins and outs of the program as it will be used to draw the layout plan.
http://www.trackplanning.com/
Have also started to learn "TrainController" gold edition, software for controlling a model railway and arguably the best program on the market.
Here is the link if you want to have a little look at it......

http://www.freiwald.com/pages/traincontroller_gold.htm



   

No comments:

Post a Comment